Notice: Trying to get property 'name' of non-object in /home/galileoar/webapps/galileoar/backoffice/wp-content/themes/galileo/archive.php on line 12
03/29/2024
PLN Batam distributes CNG among the insular populations of Indonesia by using Galileo’s technology
PLN Batam will supply Compressed Natural Gas (CNG) by ship to fuel the power generation plant of Bintan Island, in the Riau Islands Province of Indonesia.
03/29/2024
A Galileo’s compressor duplicates the secondary oil recovery in Punta Arenas
Galileo installed a 200 kW power compressor package for gas-lift application in the Posesión Well, ran by the Chilean oil company ENAP in the surroundings of Punta Arenas.
03/29/2024
Galileo breaks new record in CNG supply for power generation
The Indonesian state-owned electricity company PT PLN has opened a new Compressed Natural Gas (CNG) Storage Facility in Muara Tawar, Bekasi, West Java, which is equipped with 16 Microbox® CNG compressor packages supplied by Galileo.
03/29/2024
CNG Case study: Madrid’s Municipal Transport Company (EMT) Sanchinarro Operation Center
Galileo has designed and built the largest and fastest CNG station in Europe, equipping it with Microcore® MSP330 CNG Compressors and EMB® Dispensers.